As we are returning to the drama room with an expensive camera we are required to write another risk assessment to make sure that we know the risks being in the drama room and using the camera. This assessment is similar to the last but as certain things are different this time around there were some different risks.
Showing posts with label Risk Assessment. Show all posts
Showing posts with label Risk Assessment. Show all posts
Tuesday, 1 December 2015
Tuesday, 24 November 2015
Risk Assessment: Forest #2
Before heading off to our location tomorrow to film we are required to write a risk assessment to show that we understand and acknowledge all of the risks present. We have identified these risks and the ways to avoid them.
Tuesday, 17 November 2015
Risk Assessment: Drama Room #2
As we will be filming in a drama room tomorrow with filming equipment and we had to identify the risks and figure ways around these risks. We have written up a risk assessment to show that we have identified the risks.
Thursday, 12 November 2015
Risk Assessment: Forest
As we are heading to our forest location to film some shots tomorrow (13/11/15) we were required to fill in a risk assessment. This is to show that we have recognised the dangers of filming in our location, the level of the risk and ways to avoid them. Luckily none of the risks are extreme and the highest risk is slipping or tripping over but this is easily avoidable.
We will be filming and checking the footage tomorrow to check over what we have filmed and where it could fit in with the song.
We will be filming and checking the footage tomorrow to check over what we have filmed and where it could fit in with the song.
Subscribe to:
Posts (Atom)